Our technicians at work


Surface preparation and blasting to SA 2.5 on a 36" BOP Riser. Location: Offshore Nigeria

Application Of Primer To Blasted Surface

Application Of Technowrap 2k By Trained PLR Technicians

Completed Composite Repairs On A 36" BOP Riser Location: Offshore Nigeria


Projects Executed (before and after)


2" into 12" Gas leak line (Before)

2" into 12" Gas leak line (After)

6" Gas leak line (Before)

6" Gas leak line (After)

36" Riser (Before)

36" Riser (After)

6" into 3" Gas line leak (Before)

6" into 3" Gas line leak (After)

2" Gas line leak (Before)

2" Gas line leak (After)

4" Flange leak (Before)

4" Flange leak (After)

2" into 10" Cut-Out Line (Before)

2" into 10" Cut-Out Line (After)

4" Crack GRE Fire water line (Before)

4" Crack GRE Fire water line (After)

3" Leak Gas line (Before)

3" Leak Gas line (After)

6" Gas line leak (Before)

6" Gas line leak (After)

2" Leak Gas Line (Before)

2" Leak Gas Line (After)

6" Pitted Fuel Gas Line(Before)

6" Pitted Fuel Gas Line (After)